All-division quantity takeoff read directly from the drawings — sitework through finishes and MEP — organized by CSI division and traceable back to the element it came from.
Why it matters
The measuring, counting and tabulating that fills an estimator's week is the part a machine should do — so your estimators spend their time on pricing, scope and risk.
A takeoff that covers every division catches the scope gaps that turn into change orders: the divisions nobody had time to quantify before the bid was due.
Every quantity points back to the elements and sheets it was measured from, so you can audit a number instead of trusting it.
Capabilities
Roughly fourteen working divisions across sitework, structure, envelope, interiors and MEP — so a set produces a complete quantity picture rather than a few trades.
Areas, lengths, counts and volumes derived from the building and site elements themselves — walls, slabs, openings, finishes, fixtures, paving, utilities and earthwork.
Quantities are grouped by division and by system, with level and area breakdowns, so they drop into your estimate structure instead of fighting it.
See quantities per level, per building and per phase, which is what makes scheduling, buyout packages and progress billing straightforward.
Beyond quantities: where the documents are ambiguous, where scope is undefined, and where an assumption is carrying risk into the bid.
Turn division quantities into trade packages so subcontractors bid the same defined scope — and so you can compare their numbers against yours.
When a revised set lands, run it again and compare. Quantity deltas by division are the fastest way to understand what a design change actually costs.
Export structured quantities with their source references for your estimating system, your owner, or the record on a change-order conversation.
How it works
Architectural, structural, civil and MEP drawings as issued. No modeling, tagging or manual markup step first.
AutoSitu builds a structured understanding of the building and site — elements, assemblies, levels and areas — from the documents themselves.
Measured quantities are compiled by CSI division and system, with level and area breakdowns and the source reference for each figure.
Take the quantities into pricing, split them into trade packages, and rerun on the next issue to see exactly what changed.
Coverage
Organized on CSI MasterFormat so quantities land in the structure your estimating team already uses.
Elements and quantities analyzed
Construction scope reviewed
Developments analyzed
FAQ
Every solution runs on the same project model, so the work you do here carries forward into everything that follows.
Schedule Private Demo