AutoSitu evaluates zoning, site constraints, entitlement requirements, concept plans and downstream compliance in one system — so development teams find the deal-breaking risks earlier, move good projects forward faster, and stop committing capital to the wrong assumptions.
Density, setbacks, height, parking, access, utilities, environmental constraints, entitlement pathway and jurisdiction requirements determine what the site actually supports — long before anyone models a return.
Zoning consultants, architects, civil engineers, attorneys, brokers and your own team each hold part of it, on their own timeline and in their own format.
Something that looked minor at acquisition turns into redesign, lost units, another hearing, months of delay — or a deal that no longer pencils.
AutoSitu evaluates the site, jurisdiction, design and compliance conditions continuously as the project develops, and surfaces the assumptions and risks that deserve human attention. Your team spends less time assembling information and more time deciding what to do with it.
Deploy capital with more certainty.
Zoning envelope, buildable area, unit and parking yield, site constraints and the jurisdiction's posture — assembled into one sourced study while the site is still a decision instead of a commitment.
Entitlement pathway, discretionary triggers, conditions of approval, agency requirements and the environmental and civil questions that decide how long approval actually takes.
As the design develops, check it against the program, yield and constraints the deal was underwritten on — so the drift that quietly costs units is caught while it is still a drawing.
Review the set against zoning, building, fire, accessibility and local requirements — and against the jurisdiction's own submittal expectations — before it becomes a comment letter and another month.
Delay is the cost every development team already pays and rarely prices. Put your own numbers in — the point is the order of magnitude, not the decimal.
An estimate from your inputs only: capital cost, taxes and insurance, and consultant burn. It excludes opportunity cost, escalation and the value of a deal you never got to.
Verified platform totals across the developments AutoSitu has analyzed — not modeled savings.
Start with a practical land decision in the real estate entitlement and site feasibility guide
For power-intensive projects, use the data center feasibility guide
Get the buildable answer, the entitlement risk and the compliance exposure in front of the decision — instead of months into proving it.