Skip to main content
    For Developers

    Kill bad deals earlier.
    De-risk good ones faster.

    AutoSitu evaluates zoning, site constraints, entitlement requirements, concept plans and downstream compliance in one system — so development teams find the deal-breaking risks earlier, move good projects forward faster, and stop committing capital to the wrong assumptions.

    01Site Feasibility
    02Entitlement pathway
    03Concept plan
    04Code Compliance
    05Quantity Takeoff
    The constraint

    Every unknown gets more expensive as the deal progresses.

    Early assumptions drive the pro forma

    The site decides what the deal can be.

    Density, setbacks, height, parking, access, utilities, environmental constraints, entitlement pathway and jurisdiction requirements determine what the site actually supports — long before anyone models a return.

    Due diligence is fragmented

    Nobody holds the whole answer.

    Zoning consultants, architects, civil engineers, attorneys, brokers and your own team each hold part of it, on their own timeline and in their own format.

    The expensive problems surface late

    A harmless assumption becomes a re-entitlement.

    Something that looked minor at acquisition turns into redesign, lost units, another hearing, months of delay — or a deal that no longer pencils.

    Leverage

    An AI development team working before every major decision.

    AutoSitu evaluates the site, jurisdiction, design and compliance conditions continuously as the project develops, and surfaces the assumptions and risks that deserve human attention. Your team spends less time assembling information and more time deciding what to do with it.

    The deal
    1 site
    zoning · title · topo · utilities · jurisdiction
    Evaluated in parallel
    AutoSitu
    feasibility · entitlement · design · compliance
    Risks surfaced
    Sourced
    assumptions and constraints, with the citation
    Decided by your team
    Go / no-go
    acquisitions · development · capital markets

    Deploy capital with more certainty.

    One project intelligence layer

    From first look to final approval.

    01
    Acquisition

    Know what you can build before you buy.

    Zoning envelope, buildable area, unit and parking yield, site constraints and the jurisdiction's posture — assembled into one sourced study while the site is still a decision instead of a commitment.

    Zoning envelopeYieldSite constraintsPrecedents
    02
    Development

    Know what can derail the entitlement before it does.

    Entitlement pathway, discretionary triggers, conditions of approval, agency requirements and the environmental and civil questions that decide how long approval actually takes.

    EntitlementConditionsAgenciesCivil due diligence
    03
    Design

    Keep the project inside the assumptions that made it pencil.

    As the design develops, check it against the program, yield and constraints the deal was underwritten on — so the drift that quietly costs units is caught while it is still a drawing.

    ProgramYieldConcept planDesign drift
    04
    Approvals

    Catch compliance risk before it becomes another review cycle.

    Review the set against zoning, building, fire, accessibility and local requirements — and against the jurisdiction's own submittal expectations — before it becomes a comment letter and another month.

    Code complianceCompletenessComment cyclesResubmittal
    Delay cost

    What does one month cost this project?

    Delay is the cost every development team already pays and rarely prices. Put your own numbers in — the point is the order of magnitude, not the decimal.

    ≈ $130,000 / month of delay
    3 months ≈ $390,000
    6 months ≈ $780,000

    An estimate from your inputs only: capital cost, taxes and insurance, and consultant burn. It excludes opportunity cost, escalation and the value of a deal you never got to.

    The difference

    Same capital. Far better information.

    Without AutoSitu
    • 01Go/no-go rests on assumptions nobody has time to verify.
    • 02Diligence arrives in pieces, from six parties, on six timelines.
    • 03Constraints get discovered in the order they happen to surface.
    • 04Bad deals consume months of team time before they die.
    With AutoSitu
    • 01The buildable answer and its sources arrive before the deposit is hard.
    • 02One system holds the site, jurisdiction, design and compliance picture.
    • 03Risks surface ranked, with the requirement each one comes from.
    • 04Weak deals die early; good deals move with fewer surprises.
    Proof

    Evaluated at platform scale.

    Verified platform totals across the developments AutoSitu has analyzed — not modeled savings.

    25,000+
    Developments analyzed
    $18B+
    Development value evaluated
    8.7M+
    Requirements checked
    Further reading

    Start with a practical land decision in the real estate entitlement and site feasibility guide

    For power-intensive projects, use the data center feasibility guide

    Know sooner.
    Commit capital with confidence.

    Get the buildable answer, the entitlement risk and the compliance exposure in front of the decision — instead of months into proving it.