Skip to main content
    For Planning Firms

    The context doesn't leave
    when the project does.

    AutoSitu gives planning and design firms one system of record across every jurisdiction they work in — the precedent, the scenarios and the cited site-plan review behind comprehensive plans on one side and entitlement-bound site plans on the other — so your planners spend their hours on the recommendation, not on getting back up to speed.

    01Jurisdiction Insight
    02Precedent Research
    03Zoning Scenarios
    04Site Plan QA/QC
    05Zoning & Civil Compliance
    Who this is built for

    Comp plans on one side, site plans headed to Plan Commission on the other.

    Community planning & policy

    Comprehensive plans, corridor studies, county-wide land use.

    Dozens of jurisdictions in one plan, none of them talking to each other. The work is knowing what every one of them has adopted, proposed and approved — and what changed since the last time you looked.

    Comp plansSub-area plansZoning auditsText amendments
    Site design & entitlement

    Zoning-facing site plans headed for Plan Commission.

    Schematic design through design development, in front of staff before an architect touches a building permit. The work is getting the site plan through the hearing the first time, in a village you may have never worked in.

    Site plansPUDsVariancesStreetscapes
    The constraint

    Zoning isn't black and white. Neither is getting up to speed.

    Dozens of jurisdictions a year

    Every village has a written code — and an unwritten reading of it.

    How a given city's staff actually applies their own ordinance lives in senior planners' heads and in old staff reports. A new jurisdiction means starting from zero on that institutional knowledge.

    Getting up to speed is the unbillable half

    Research, then research again on the next project.

    Pulling the ordinance, the overlays, the last approvals and the last hearing happens per site, per project, per planner. Little of it carries forward.

    QA/QC is a punch list and a memory

    The check depends on who reviewed it and when.

    Site plan QA/QC today is a punch list and a senior reviewer's attention before the deadline — not a system that runs on every set, every iteration.

    Paper and practice diverge

    The gap shows up as a staff comment.

    What the code allows and what a jurisdiction actually approves can differ. That gap is invisible until the comment letter comes back — or until a neighboring jurisdiction changes the rules and nobody told you.

    Leverage

    An AI planning analyst on every site, in every jurisdiction.

    AutoSitu maps how each jurisdiction actually works, researches precedent and hearings, runs your punch list and the zoning and civil checks against the site plan in parallel, and hands your planners a cited list of what needs a professional decision.

    Jurisdictions you work in
    Dozens
    villages · townships · counties · overlays
    Researched and checked in parallel
    AutoSitu
    codes · staff reports · hearings · precedents · site plans
    Surfaced with sources
    Cited findings
    every claim traced to a page on the source document
    Authored by your planners
    Your firm
    recommendations · amendments · stamped site plans

    Spend the hours on the plan, not the paper trail.

    How AutoSitu fits

    From the first jurisdiction search to the site plan you stamp.

    01
    Jurisdiction Insight

    Walk into the room already knowing the precedent.

    Staff reports, public hearing video, what was approved nearby and why, what a third-story step-back cost the last applicant — researched before you're in front of the commission, not reconstructed after the comment letter. What's new in the jurisdiction surfaces on its own; mark it applicable or not and keep a clean record.

    Staff reportsHearing videoNearby approvalsWhat's new
    02
    Zoning scenarios

    Test by-right, TIF, PUD — or the code you're proposing.

    Start from the parcel, the district and the overlays, then reason through the paths: what by-right yields, what a PUD buys and what it costs in timeline, or disregard current zoning entirely and evaluate the amendment you're drafting for the client.

    By-rightTIFPUDText amendmentPrecedent imagery
    03
    Your checklist, not ours

    Your punch list becomes the QA/QC layer.

    Upload the firm's own punch list — graphics, scale bars, text sizes, sheet setup, the things a principal checks before a set leaves the studio. AutoSitu digests it and walks every item on every iteration, at SD and again at DD. It's your standard, not a generic one.

    Firm punch listSD / DDGraphics standardsEvery iteration
    04
    Zoning & civil compliance

    Every finding traceable to a page and a box on the source.

    Zoning and civil checks run against the actual site plan. Each finding cites the code section and the sheet, jumps to the page and draws the bounding box around what it read — legend first, then the drawing, the way a reviewer does. The footnote holds up when someone clicks it.

    ZoningCivilPage-level citationsBounding boxes
    05
    Context carries forward

    What you learned at feasibility checks the site plan later.

    The jurisdiction hierarchy mapped at setup, the precedents found at insight, the scenarios you weighed — none of it is thrown away. The same context reviews the site plan and the resubmittal, inside a sandbox that belongs to your firm alone.

    One project recordPer-firm sandboxResubmittalsAudit trail
    The difference

    One planner. Every jurisdiction covered.

    Without AutoSitu
    • 01Jurisdiction context is rebuilt per project, per planner, from scratch.
    • 02Precedent lives in a senior planner's memory and an old staff report folder.
    • 03The punch list is run when someone has time before the deadline.
    • 04You learn what staff actually reads into the code from the comment letter.
    With AutoSitu
    • 01Hierarchy mapped once, documents searched fresh on every run.
    • 02Staff reports, hearings and nearby approvals surfaced before the meeting.
    • 03Your punch list runs on every set, every iteration, at SD and DD.
    • 04Zoning and civil findings cite the page and the box before staff sees the set.
    Straight answers

    The questions planners actually ask.

    Does the AI replace anyone's stamp?

    No. AutoSitu does the first pass — the research, the reading, the repetitive checks. A planner reviews every finding, decides, and signs. Checkpoints are built in because the person putting their name on the plan has to trust what's under it.

    Is QA/QC the same thing as code compliance?

    They're two distinct gates, not one black box. QA/QC checks the set against your firm's punch list — how the plan should look and read. Compliance checks it against the jurisdiction's zoning and civil requirements, with the code section cited. You see which gate flagged what.

    What about a township whose zoning update never made it online?

    Setup maps how the jurisdiction actually works — including a township that adopts county standards or a state law that overrides the local district. Then every run searches dynamically for the current documents. It's not a static code database that quietly goes stale.

    How fast can you cover the jurisdictions we already work in?

    Give us the names. The first 15–20 jurisdictions take a day or two; after that, about three more each week. No code documents to upload — mapping the hierarchy is on us.

    Built for breadth

    Made for firms that work in dozens of jurisdictions, not one.

    Setup is a hands-on service: give us the names of the jurisdictions you already work in and we map the hierarchy — which code applies, which county standard a township adopts, which state law overrides the district.

    15–20
    Jurisdictions set up in the first day or two
    ~3 / week
    Additional jurisdictions after that
    0
    Code documents you have to upload
    Further reading

    See how jurisdiction research feeds entitlement strategy in the entitlement & site feasibility guide

    Compare cited, page-level plan review approaches in the AI plan review buyer's guide

    Be the firm that already knows.

    Bring us a site plan from a jurisdiction your team knows cold. If AutoSitu can't tell you something about that jurisdiction's precedent or your own set that you didn't already know, you've lost an hour.