Skip to main content
    For General Contractors

    Cover more projects.
    Catch risk before the field.

    AutoSitu gives preconstruction and project teams an AI intelligence layer across design review, compliance, constructability, takeoff, and scope — so your experts can oversee more work without manually reviewing every drawing, requirement, and quantity.

    01Design Review
    02Compliance
    03Constructability
    04Takeoff
    05Scope & Buyout
    The constraint

    Your best people can't be on every project.

    Management bandwidth

    More projects. The same experienced people.

    Preconstruction managers, estimators, VDC leaders, QA/QC teams, and project executives are stretched across an increasing number of jobs.

    Too much manual review

    Experts spend hours finding problems instead of solving them.

    Every new drawing set means another round of reading, comparing, quantifying, coordinating, and checking.

    Problems found too late

    A missed issue in preconstruction becomes an expensive field problem.

    Scope gaps, coordination conflicts, code issues, and quantity misses become RFIs, change orders, rework, schedule disruption, and margin loss.

    Leverage

    An AI preconstruction team working across every project.

    AutoSitu reviews project information in parallel — drawings, specifications, codes, quantities, and scope — and surfaces the exceptions that require human judgment. Instead of asking your experts to find every issue, give them the highest-value issues to resolve.

    Project information
    1000s
    drawings · requirements · elements
    Reviewed in parallel
    AutoSitu
    design · compliance · constructability · quantities · scope
    Exceptions surfaced
    20
    issues requiring attention
    Resolved by your team
    Precon · VDC
    estimating · QA/QC · operations

    Multiply the reach of your project team.

    One project intelligence layer

    From first look to final buyout.

    01
    Early project intelligence

    Know what you're walking into.

    Where the GC is involved early, evaluate zoning, site constraints, jurisdiction requirements, utilities, and entitlement conditions before the design is fully developed — for design-build, developer-GC work, and pursuits.

    FeasibilitySite constraintsJurisdiction intelligence
    02
    Design & constructability review

    Find the problems before the field does.

    Review drawings and specifications for QA/QC issues, discipline conflicts, constructability risk, missing information, and the conditions most likely to generate RFIs or rework.

    QA/QCCoordinationConstructabilityDrawing & spec review
    03
    Compliance

    Catch requirements before they become project problems.

    Review building, fire, accessibility, civil, planning, and local jurisdiction requirements before they turn into redesign, permit comments, procurement changes, or field delays.

    BuildingFireADACivilLocal requirements
    04
    Takeoff

    Know what's actually in the job.

    Extract and organize quantities across the project so estimating and preconstruction can understand the design without manually measuring every condition.

    SiteworkStructureArchitecturalMEP
    05
    Scope & buyout

    Make sure every piece of work has an owner.

    Turn quantities and design conditions into construction scopes, then surface unassigned work, overlapping responsibility, ambiguous scope, and buyout gaps before contracts are written and work reaches the field.

    Scope coverageTrade assignmentScope gapsBuyout intelligence
    Waterproofing
    47
    conditions identified
    43 assigned
    4 scope gaps
    Structural steel
    182
    elements identified
    182 assigned
    Covered
    The difference

    One expert. More projects covered.

    Without AutoSitu
    • 01Senior people manually review thousands of pages on every project.
    • 02Estimating, VDC, QA/QC, and operations repeat overlapping analysis.
    • 03Experienced staff are limited by how many projects they can personally touch.
    • 04Missing scope and design issues surface during procurement or construction.
    With AutoSitu
    • 01AI performs the first pass across drawings, requirements, quantities, and scope.
    • 02Teams work from prioritized exceptions instead of searching for problems.
    • 03Scarce experts can support a larger portfolio of projects.
    • 04Risk gets resolved in preconstruction, when it is cheaper and easier to fix.
    Asynchronous review

    Your project keeps moving, even when your team isn't reviewing it.

    Turn project review into an asynchronous workflow. Run updated plan sets through AutoSitu, surface changes and risks, quantify the design, and prepare prioritized findings for the people responsible for the project — so your experts spend their time making decisions, not searching drawings for what changed or what was missed.

    01
    Plans updated
    02
    AutoSitu reviews
    03
    Risks prioritized
    04
    Team resolves

    Catch it in preconstruction.
    Not in the field.

    Give every project an AI-powered first pass across design, compliance, constructability, quantities, and scope — and let your best people focus on the decisions that require their expertise.